Contact Info

Book Your Appointment

Commercial RTU Upgrade at Pocono Palace Resort

Client Pocono Palace Resort
Service RTU Replacement & Controls
Project Type Commercial HVAC Upgrade
Location Pennsylvania
Status Completed
Pocono Palace Resort

Project Overview

Pocono Palace Resort needed a commercial HVAC upgrade with new HVAC units and a modernized control system. The client wanted centralized comfort control, enhanced energy efficiency, and a better guest experience.

Lehigh HVAC installed three rooftop units and a Wi-Fi-integrated setup to meet the property's needs. The upgraded system provided centralized equipment management and greater control over heating and cooling.

Commercial RTU upgrade at Pocono Palace Resort
Project Challenge

Coordinating Three RTUs With a Modern Control System

The project required more than installing rooftop units. The real challenge was to tie those individual units into a setup that allowed staff simpler control over everyday HVAC operations.

  • Coordinating three rooftop units within one control strategy
  • Integrating Wi-Fi connectivity with commercial HVAC controls
  • Configuring centralized operation for easier system management
Multi-RTU commercial HVAC upgrade challenge
Our Solution

A Multi-RTU Upgrade With Centralized Controls

A coordinated installation process combined new rooftop equipment with modern HVAC control technology.

RTU System Assessment

Our technicians evaluated the existing rooftop equipment and building requirements to establish standards for seamless installation and code compliance.

Rooftop Unit Replacement

We removed the outdated equipment and installed three new RTUs configured to meet the property's heating and cooling requirements.

Wi-Fi Control Integration

We streamlined the HVAC controls and connected the system through Wi-Fi, creating a centralized management setup for the newly installed units.

Testing & Commissioning

We tested the new equipment and controls to verify proper operation, communication, system response, and coordinated HVAC management.

On The Job

Project Gallery

A closer look at the multi-RTU upgrade and controls installation completed by the Lehigh HVAC team.

The Result

Reliable Comfort. Improved Efficiency.

New System High Efficiency RTU
Comfort Improved Temperature Control
Reliability New Commercial Equipment
Installation Fully Tested & Commissioned

The upgraded system gave Pocono Palace Resort centralized HVAC control through a modern Wi-Fi-integrated setup — improving efficiency and the guest experience.

What We Provided

Services Used In This Project

Commercial RTU Installation

Installing three rooftop units with modern commercial equipment.

HVAC Controls Integration

Connecting multiple rooftop systems through centralized controls.

Wi-Fi HVAC Control Setup

Establishing connected access for centralized system management.

HVAC System Commissioning

Testing equipment and controls for coordinated operation.

Why Businesses Choose Lehigh HVAC

  • Licensed & Certified Technicians
  • Commercial HVAC Expertise
  • Reliable Installation
  • Professional Service
Our Work

More Projects

Explore more commercial projects completed by our experienced team.

Flaming Hot Halal Grill RTU Replacement
Commercial HVAC / RTU Upgrade

Flaming Hot Halal Grill RTU Replacement

Lehigh HVAC successfully removed the old RTU system and installed a brand-new, high-efficiency unit at Flaming Hot Halal Grill. The upgrade ensures improved comfort, reliability, and energy savings for the restaurant.

View Project
Galip Residence Heat Pump
Residential HVAC

Galip Residence Heat Pump

Lehigh HVAC completed a residential project for Galip, installing a 3.5-ton heat pump along with custom-designed ductwork. This system ensures consistent heating, cooling, and optimal airflow throughout the home.

View Project
Precision Medical RTU Replacement
Commercial HVAC Restoration

Precision Medical RTU Replacement

Lehigh HVAC investigated, advised, and executed the replacement of 4 compromised 30-year-old Trane RTUs at Precision Medical, completing installation and electrical corrections within three days for optimal system operation.

View Project
11

11+Year Working Experience

Contact Us

Service You Want: